Remove weeds and debris.
Install any hardscapes or planter beds and edging.
Prepare a rough grade by filling low spots, ensuring the grade falls away from the house, and about an inch lower than hardscapes and beds.
Add compost at a rate of 3-4 yards per 1000sf and rototill 4-6 inches in depth.
Install a sprinkler system or ensure an existing system waters evenly and completely.
Rake the final grade to a smooth and uniform surface.